An every-other-week meeting can produce different Sunday dates depending on where its recurrence rule starts the week. If the schedule selects both Tuesdays and Sundays, compare the actual dates with the organizer’s intended pattern; a matching start date and four-occurrence count are not enough.
RFC 5545, September 2009, section 3.3.10, defines WKST as the week-start day, defaults it to Monday when omitted, and identifies its significance for certain multiweek rules with BYDAY. The example below is a fictional DATE-only comparison, not a calendar-client test.
The same start, two week boundaries
Start Tuesday May 4, 2027. Both complete fragments use FREQ=WEEKLY;INTERVAL=2;BYDAY=TU,SU;COUNT=4; the only difference is WKST. There are no exclusions, additions or overrides, and the synchronized start counts first.
| Week start | Active intervals | Dates from the start |
|---|---|---|
| Monday (WKST=MO) | May 3–9 and May 17–23 | May 4, May 9, May 18, May 23 |
| Sunday (WKST=SU) | May 2–8, May 16–22 and May 30–June 5 | May 4, May 16, May 18, May 30 |
May 2 belongs to the first Sunday-starting interval but precedes DTSTART, so it is not an earlier occurrence. In the May 16 interval, Sunday comes before Tuesday even though TU appears first in BYDAY. COUNT stops the second list at May 30, before June 1.
Check the dates, not just the count
A list copied from the Monday version into the Sunday version wrongly includes May 9 and May 23 and omits May 16 and May 30. Shifting every old date seven days is not a fix: it would also move the Tuesdays, which remain May 4 and May 18. Generate the active intervals, then their selected weekdays in chronological order.
INTERVAL=2 applies to weekly intervals, not to the gap between every meeting. A simple sequence of fourteen-day steps from May 4 would omit the Sundays. If the instruction changes to every week, INTERVAL=1 gives May 4, May 9, May 11 and May 16 under either boundary.
Missing evidence is not a default
If a fully captured rule omits WKST, RFC 5545’s Monday default applies. If an incomplete extract says the week-start part was not preserved, the original could have specified Sunday; the two lists above show why the missing value matters. Obtain the full rule and confirm the intended pattern before using the dates for planning. This check does not send invitations or establish venue availability.
Explore Infinite Upside
For Vijay Sheth’s personal accounts, read Infinite Upside: Building Wealth With Room to Live, published by Sheth Capital, Inc.
Compare monthly recurrence patterns
Why did a monthly meeting skip or change dates?