When a production resource is genuinely limited, compare the contribution generated by each product with the amount of that resource it uses—not only the contribution per unit. Then test the proposed mix against actual demand, commitments, whole-unit requirements and every other relevant constraint. A ranking can help build a plan; it does not create demand, cash or an unrestricted production schedule.
The basic question is what the scarce capacity is being used to do. A product that contributes more per unit can use so much of the limiting machine’s time that a lower-contribution item generates more contribution per machine hour. That observation can change the preferred mix. But a second shortage, a setup cost or a required customer order can change the answer again.
We will work a small fictional two-product problem to completion, prove the best outcome under its supplied limits and then change the available resources. The prices, costs and orders are invented inputs—not a forecast or a recommendation for a real factory.
Define the resource and the decision
Imagine a shop making products A and B for the next defined production period. The question is how many whole units of each to make and sell within that period. The shop has 100 usable hours on one required machine. A uses three machine hours per unit; B uses one. Setup time, maintenance and quality losses are already accounted for in that stated usable capacity. If those assumptions are not true for a real shop, change the inputs before using the calculation.
Confirmed available demand is at most 30 units of A and 40 units of B. In this hypothetical, the shop may choose any whole-number quantity from zero up to each limit; there are no minimum orders, partial batches or contractual priorities. Every unit selected can be sold at the supplied price in the period. A real confirmed order, minimum lot or delivery promise can restrict that freedom and must be included separately.
Each unit’s contribution is its selling price less the variable costs included in this model. For A, the price is $80 and variable cost is $20, so contribution is $60 per unit. For B, price is $70 and variable cost is $30, so contribution is $40 per unit. The supplied variable costs include all costs that change with each selected unit under the example. Fixed operating costs are separately $2,000 for the period and do not change with the mix in the base case.
Scroll horizontally to see all columns.
| Product | Selling price | Variable cost | Contribution per unit | Machine hours per unit | Demand limit |
|---|---|---|---|---|---|
| A | $80 | $20 | $60 | 3 | 30 units |
| B | $70 | $30 | $40 | 1 | 40 units |
Contribution is not net profit or cash received. It must still cover the stated fixed costs and anything else outside the defined model. A customer order, completed production, invoice and collected payment are different events. The exercise assumes the units selected are sold at the supplied terms; it does not establish when cash arrives.
Calculate contribution per scarce hour
A provides $60 over three machine hours, or $20 per machine hour. B provides $40 over one machine hour, or $40 per machine hour. A has the higher contribution per unit, but B has the higher contribution per unit of this constrained resource.
The OpenStax managerial-accounting discussion of constrained resources explains the role of contribution per unit of a scarce resource. That method is a starting point for the stated production decision; it is not a guarantee that the same ranking solves a problem with multiple restrictions or changing costs.
Filling all 40 units of B uses 40 machine hours and contributes 40 × $40 = $1,600. The remaining 60 hours can make 60 ÷ 3 = 20 whole units of A, contributing 20 × $60 = $1,200. This plan uses all 100 hours and stays within both demand caps.
The combined contribution is $2,800. Subtracting the supplied $2,000 unchanged fixed cost leaves an $800 modeled operating result within this narrow period. It is not necessarily the business’s net income, cash flow, tax result or result after costs omitted from the exercise.
Compare a unit-ranking alternative
A manager who ranks only contribution per unit might make all 30 units of A first because $60 is greater than $40. Those A units use 30 × 3 = 90 hours. The remaining 10 hours can make 10 B units. Contribution is 30 × $60 + 10 × $40 = $2,200; after the same $2,000 fixed cost, the modeled result is $200.
Scroll horizontally to see all columns.
| Plan | A units / hours | B units / hours | Total contribution | After $2,000 fixed cost |
|---|---|---|---|---|
| Scarce-hour ranking | 20 / 60 | 40 / 40 | $2,800 | $800 |
| A-first by unit contribution | 30 / 90 | 10 / 10 | $2,200 | $200 |
The difference is $600 under the supplied assumptions. It does not mean A is an undesirable product or that the shop should cancel an actual A order. It means that, in this particular period, using scarce hours on B first produces more contribution while the supplied B demand is available.
Both plans leave some potential demand unserved: the first leaves 10 A units; the second leaves 30 B units. If those units are existing obligations, late-delivery penalties or relationship consequences must be included before choosing either plan. The base example expressly has no such minimums or consequences, so it does not resolve them.
Prove the base result rather than trusting a label
Let a and b be whole units of A and B. The stated limits are 3a + b ≤ 100 machine hours, a ≤ 30 and b ≤ 40, with neither quantity negative. The contribution is 60a + 40b.
Rewrite that objective as 20(3a + b) + 20b. Because machine use is at most 100 and b is at most 40, contribution cannot exceed 20 × 100 + 20 × 40 = $2,800. The plan a = 20 and b = 40 reaches both bounds: 3 × 20 + 40 = 100 hours and contribution is $2,800. It is therefore an optimal feasible plan for this complete fictional problem.
The proof matters because “make the highest ratio first” can fail in a whole-unit problem when capacity does not divide neatly, when a minimum batch applies or when other constraints bind. Here the selected quantities happen to use all 100 hours and achieve an explicit upper bound. The result follows from the full stated problem, not merely from the ratio.
If demand for B is not actually available, the 40-unit cap is not a sales guarantee. Replace it with supported demand or a scenario and recalculate. Likewise, a quoted machine rate that omits changeovers or capacity already committed elsewhere would overstate the 100 available hours. Keep the plan’s evidence and its assumptions together.
Add a small capacity option
In a separate branch, suppose the shop can obtain 10 additional usable machine hours for a complete incremental cash and operating cost of $100. The extra time is qualified, available in the same period and does not consume another scarce resource. Prices, unit costs and demand caps remain unchanged. Those are supplied conditions, not a claim that overtime is always available or costs $100.
With 110 hours, making all 40 B units uses 40 hours. The remaining 70 hours can make only 23 whole A units, using 69 hours and leaving one unused hour. Contribution is 40 × $40 + 23 × $60 = $2,980, an increase of $180 from the base plan. After the additional $100 cost, the modeled improvement is $80. With the original $2,000 fixed cost and no other changes, the branch result is $2,980 − $2,000 − $100 = $880.
It would be tempting to multiply the 10 additional hours by A’s $20-per-hour contribution and claim $200. That would assume fractional production or usable work for the leftover hour. The supplied whole-unit problem gives only three additional A units, worth $180, leaving one hour without another stated use. The actual incremental value of this 10-hour package is not a universal hourly value.
Could a different mix use the 110 hours better? At B = 40, at most 23 A units fit, producing $2,980. At B = 39, at most 23 A fit, producing $2,940; at B = 38, at most 24 A fit, producing $2,960. For B of 37 or less, the expression 20(3a+b)+20b is at most 20 × 110 + 20 × 37 = $2,940. Thus none of those cases beats the proposed $2,980 under the supplied whole-unit constraints.
The extra $100 must be available and actually buys the specified usable hours. If the time is paid but the worker is unavailable, the machine is not released or demand disappears, the branch’s assumed improvement is not established. A quoted opportunity, an authorized shift, completed production and collected sales remain separate states.
Change the problem when a second resource is limited
Now return to the original 100 machine hours and add a different constraint: only 36 packaging units are available. A uses one packaging unit per product; B uses two. The original demand caps and contributions remain. The earlier 20 A / 40 B plan would require 20 + 80 = 100 packaging units, so it is infeasible under this new condition.
A feasible changed plan is 30 A and 3 B. It uses 30 × 3 + 3 = 93 machine hours and 30 + 2 × 3 = 36 packaging units. Contribution is 30 × $60 + 3 × $40 = $1,920. With the same $2,000 fixed cost, the narrow modeled result is −$80. Seven machine hours remain unused because packaging, not machine time, limits this supplied plan.
For this specific changed problem we can also verify the bound. Packaging gives a + 2b ≤ 36. Rewrite contribution as 60a + 40b = 40a + 20(a + 2b). Since a ≤ 30, the total cannot exceed 40 × 30 + 20 × 36 = $1,920. The 30 A / 3 B plan reaches that bound while respecting the machine limit, so it is optimal for the stated changed problem.
This is not a general formula for two-constrained problems. It is a proof for the particular fictional coefficients. The important result is that the base machine-hour ranking alone cannot settle the new case: B uses twice as much packaging per unit, and the packaging limit changes which mix is feasible. More complex combinations can require a complete optimization method and competent review.
Check commitments, setups and costs before using the model
The base case assumes any unit can be chosen independently, at constant price and cost, up to the stated demand. In practice, a product may require a fixed setup, minimum batch, special tooling or a paid changeover. A promised minimum to a customer may have to be met even if its contribution per scarce hour is lower. Those requirements change the feasible plan; do not insert them afterward as an informal objection and keep the old optimum.
Inventory can matter too. A unit already finished may not consume another machine hour this period, while material purchased for a canceled order may have a different avoidable cost from a new purchase. Distinguish costs that change with the proposed decision from costs that remain either way. A cost already paid does not automatically disappear if a product is omitted, and a cash payment may occur on a different date from an accounting expense.
Check whether labor is truly included in the stated variable costs and whether the scarce machine hours are available with qualified staffing. If the extra 10-hour option requires additional supervision, transport or inspection beyond the quoted $100, the branch’s $80 improvement is incomplete. If the quality standard changes, a dollar comparison cannot by itself establish that the output is acceptable.
Prices can also change with volume. A discount required to sell the last units, an unconfirmed customer order or a different product mix can change the contribution table. Do not use a demand cap as proof that every unit will sell. An assumption that the shop can sell 40 B units is a specific input, not a result of the ratio calculation.
The ACCA’s discussion of constrained resources distinguishes contribution per constrained resource from throughput return in a theory-of-constraints setting. Use the definition that matches the actual decision; do not label the two measures interchangeable merely because both divide by a bottleneck resource.
Turn the calculation into an operating decision
List the products, relevant price and variable costs, resource use per unit, usable capacity, demand caps, required minimums and any other bottleneck. Give each input a source, period and owner. Identify what is accepted, what is forecast and what is unknown. A plan based on an unsigned order or unconfirmed overtime should carry that status in the result.
Check the selected quantities against every constraint and recompute total contribution from the units. Compare the alternative with the same cost boundary. If a plan requires new setup spending, include it only where it belongs and confirm funding. If the required inputs are missing, show the exact gap rather than issuing an optimum based on convenient estimates.
For the base example, another reader should reproduce $20 and $40 per machine hour; 40 B and 20 A; 100 hours; and $2,800 contribution. They should also verify the $2,200 A-first alternative, the $180 gross and $80 net increase from the 10-hour branch, and the $1,920 packaging-constrained upper bound. Each branch has different assumptions and must not be combined into one simultaneous result.
Finally, reconcile the proposed mix with real orders, safety, staffing and timing before treating it as an instruction to produce. A mathematically feasible plan under fictional inputs is not an accepted production schedule. The calculation is most useful when it exposes which scarce resource, demand commitment or missing cost could change the decision.