A Contract of Affreightment Needs a Shipment Calendar

The quarterly tonnage can fit while the vessel calendar does not.

A producer has six cargoes to move over three months. It wants a transport program. The operator wants room to choose which vessel carries each shipment. They may be discussing a contract of affreightment rather than six separate decisions about a named ship.

A contract of affreightment, or COA, can commit parties to transporting a specified quantity through a series of shipments over an agreed period. The useful commercial record connects that overall commitment to the shipment windows, nominations and operating resources needed to perform it. The agreement determines the actual duties.

In its 2025 annual report, Pangaea Logistics describes a COA as multiple cargoes on a route with different vessels available for individual voyages. Navigator’s 2025 report describes specified cargo quantities over a period or number of voyages, and notes that pricing can include fuel or other adjustments. These descriptions establish context, not the terms of a proposed deal.

Start with the program, not the ship

Put the total quantity, cargo description, route, contract period and shipment obligations in one record. Identify whether the obligation is a firm quantity, a range, a number of shipments or something else. Then identify who can nominate dates and vessels and how changes are accepted.

A statement such as “120,000 tons this quarter” is incomplete for operations. Six evenly spaced cargoes and six cargoes ready in the same week can require very different resources. The total volume can be identical while the schedule becomes impossible for the fleet originally imagined.

Likewise, the ability to nominate another vessel needs boundaries. The agreement may specify size, suitability, approvals, arrival windows or other requirements. A commercially convenient substitute still needs to meet the actual terms and relevant operational requirements. The existence of another vessel on a fleet list is not evidence that it can perform this shipment.

Keep the cargo owner, the contractual service provider, the vessel owner and any chartered-in capacity visible. They need not be the same entity. A customer’s transport obligation and an operator’s arrangement for obtaining a ship are separate contracts that must fit together.

Turn the quantity into a calendar

Consider an original illustration with six shipments of 20,000 metric tons each. The supplied schedule requires loading to begin on the fifth and the fourteenth of each of three months. Each shipment requires an assumed 18-day vessel cycle, including the supplied repositioning and voyage time. The contract expressly permits two suitable nominated vessels in this example.

One vessel cannot complete an 18-day cycle after the first window and also begin the next cycle nine days later. A planning sheet that lists six shipments against one available ship has found the total tonnage but lost the calendar.

Assign Vessel A to the fifth-of-month windows and Vessel B to the fourteenth-of-month windows, assuming both are available and suitable throughout. That separates their planned cycles. It does not establish actual port access, sailing time, cargo readiness or feasibility for a real trade. Those supplied assumptions still need evidence in an operating plan.

The useful schedule shows cargo-ready dates, agreed windows, nomination deadlines, vessel availability, planned loading/discharge periods and the following commitment. Record which dates are confirmed and which are forecasts. A conflict should remain a conflict until someone changes a resource or obtains an agreed schedule change.

Price the program with its assumptions

Assume the six shipments are all completed and paid at an invented $30 per metric ton. Total carried quantity is 120,000 metric tons, producing $3.6 million of freight. Assume the operator’s complete listed direct program costs are $2.7 million. The difference is $900,000 before any excluded corporate, financing, tax or other costs.

Those figures are a teaching case, not a market quote or a forecast. They give us a defined base for asking what a schedule disruption changes. A per-ton rate is only useful commercially when the quantity, service scope and adjustment terms beside it are understood.

Now consider a separate stress branch. Extra vessel time costs seven days at $15,000 a day, or $105,000. Three additional repositioning legs each require four paid vessel days at the same assumed rate, adding $180,000. Incremental fuel for those legs is $78,000. These amounts are additional to the base costs and do not overlap.

The stress adds $363,000, reducing the difference between the same freight and listed costs from $900,000 to $537,000. It does not decide which party can recover any extra cost. The operational cause and the contract’s allocation of that cause need their own records.

Scroll to see the full table.

Original completed-program cost illustration
MeasureBaseStress branch
Freight on 120,000 metric tons$3,600,000$3,600,000
Listed direct costs$2,700,000$3,063,000
Difference before excluded costs$900,000$537,000

Separate the price rule from cost recovery

If an actual COA includes a fuel adjustment, read the index, reference period, base, trigger, calculation and settlement timing. A provision tied to one published fuel measure need not reimburse the operator’s actual fuel bill. Nor does a fuel adjustment necessarily cover extra vessel days or another cost caused by delay.

Apply each rule to its own supported inputs. Keep freight, an agreed fuel adjustment and any separately claimed time or other charge visible. A convenient total called “voyage extra” can conceal a calculation that the counterparty has no way to reproduce.

Also separate the expected receipt from collection. The operator may incur charter-in hire, port costs or fuel payments before it collects freight. A profitable-looking program can need substantial working cash. The payment schedule and counterparty performance belong beside the operating schedule.

If a planning illustration holds freight constant while costs increase, say so. If a contractual adjustment changes the freight receipt, show that branch separately. Combining an unrecovered cost stress with an assumed reimbursement would erase the very exposure being examined.

Make changes visible before the next shipment

A program needs a running balance: committed quantity, accepted nominations, completed shipments and remaining obligations. Add any agreed amendment with its effective date and supporting record. Do not treat a forecast change as an accepted contractual change.

For example, a producer’s updated schedule might say only 15,000 tons will be ready for the next shipment. That is important operational information. Whether it changes the committed quantity, creates a shortfall issue, permits a later shipment or has another effect depends on the COA and the facts.

The deadfreight guide examines a separate quantity-shortfall calculation. A COA program record should identify when that question arises, then use the governing terms. It should not automatically multiply every forecast shortfall by the freight rate.

A late vessel, delayed cargo, berth restriction and agreed resequencing can all change the calendar differently. Retain the chronology and the actual notices or agreements. Naming a cause in the planning file does not settle responsibility for it.

Keep flexibility and obligation together

The program can give an operator room to combine owned and chartered-in vessels or arrange work across several voyages, where the agreement permits it. That flexibility is valuable only if the service still meets the customer’s requirements. Optimizing one vessel’s schedule can move a problem to another cargo.

Before treating a substitution or timing option as useful, identify its decision deadline, notice process, constraints and possible costs. An option that expires before the cargo forecast becomes reliable may offer less practical flexibility than the headline suggests.

For the customer, compare the program with alternatives on the same quantity and timing assumptions. A series of individually purchased voyages may offer a different commitment and different exposure to available market capacity. Neither arrangement is universally cheaper. The comparison needs the actual terms and supported alternatives.

A blanket purchase agreement has a related need to connect an umbrella arrangement with individual orders. A COA adds a maritime transport program, vessel suitability and voyage dependencies. Its value comes from coordinating those specifics, not from giving the spreadsheet a longer title.

Leave one reconstructible program record

Keep the signed terms and amendments with a schedule showing each shipment’s cargo, quantity, window, nominations, assigned vessel, completion evidence, freight and any separate adjustments. Reconcile cumulative completed quantity with the remaining program.

Give the commercial team the operating constraints and give operations the contractual dates. A vessel planner cannot resolve an unclear quantity promise by finding a ship; a contract manager cannot create a second available vessel by confirming that the quarterly total is correct.

The completed record should explain both the transport obligation and the resources that can perform it. Six shipments can be a sensible program. They become one only when the tonnage and the calendar agree.

Explore Infinite Upside

For Vijay Sheth’s personal accounts, read Infinite Upside: Building Wealth With Room to Live, published by Sheth Capital, Inc.

Find your edition · Chapter companion

ABOUT THE CONTRIBUTOR

Luna Lim

DIRECTOR OF FINANCIAL RESEARCH & EDITORIAL STRATEGY

SHETH CAPITAL, INC.

Luna Lim writes about business, investing, and the judgment behind financial decisions. She joined PCH Exotics Inc. as Director of Operations in 2022, working across La Jolla and Miami. Today, she reports directly to Vijay Sheth at Sheth Capital, Inc., bringing an operator’s perspective to the ideas she covers.

Based in Pacific Beach, California, Luna is curious about the people behind the numbers: what they’re building, how they weigh uncertainty, and what makes a risk worth taking. Her articles for Infinite Upside follow those questions through the details, with clear explanations and a feel for how decisions play out in everyday business.

More from Luna Lim

The Infinite Upside store