The performance score is up. The bonus is up. Somewhere beyond the dashboard, the owner is trying to understand why the arrangement feels less valuable.
One possible answer is that the business has made an imperfect measure more powerful. A larger payment can be very effective at encouraging the work the measure rewards. Whether that is the work the business most needs is a separate design question.
That distinction gives an owner a reason to consider a weaker bonus without deciding that employees should care less. The useful comparison is among the actions different contracts encourage, the value those actions create and the cost of obtaining them.
Two kinds of useful work, one paid score
Imagine a fictional service operation. A specialist can develop initial customer proposals and improve the instructions used by colleagues who fulfill them. Call the amounts of these two actions a1 and a2. These are abstract action units, not hours or actual employee ratings.
For this example, the business values a unit of the first action at 3 and a unit of the second at 1. Its total value is therefore 3a1 + a2. Its paid performance score, however, gives the first action a weight of 1 and the second a weight of 3: p = a1 + 3a2.
Both kinds of work contribute value. The problem is their relative weight. The score makes the second action look three times as important as the first, while the supplied business values point the other way.
Suppose taking the actions costs the specialist (a1² + a2²) / 2 in payoff units. The cost increases as either action grows, but there is no shared time constraint or competition for attention between them. Both actions must be nonnegative. Compensation is a base amount s plus b times the score, and the specialist chooses the actions to maximize compensation less action cost.
This is an original numerical illustration of a distinction developed in Robert Gibbons’s agency-theory course note. The selected exposition uses a risk-neutral, separable-cost model to distinguish firm value from a contractible measure. It also shows why a measure’s correlation with value can conceal poorly aligned incentives. The note is a useful model of a design problem, rather than an estimate of how particular employees behave.
A bigger bonus can deliver less surplus
Under the supplied assumptions, the specialist chooses a1 = b and a2 = 3b. Each action’s marginal payment equals its marginal cost. The base amount affects the payoff from accepting the job but does not change that action choice.
At a bonus slope of 0.6, the actions are 0.6 and 1.8. The score is 6. The business value is 3.6, and the action cost is 1.8. Value less action cost is therefore 1.8.
Increase the slope to 1. The actions become 1 and 3. The score reaches 10, business value reaches 6 and action cost reaches 5. The remaining joint value is only 1.
The higher slope gets more of both actions. There is no shirking, sabotage or diversion of a fixed attention budget in this example. The specialist responds exactly as the contract invites. The extra action produces value, but its cost rises faster than the value the business receives.
The paid score rises by two-thirds while joint surplus falls from 1.8 to 1. A dashboard showing only the score could give the stronger plan a congratulatory green arrow. The arrow has done its job. It was asked the wrong question.
Across nonnegative slopes, joint surplus is 6b − 5b². Its slope is 6 − 10b, which reaches zero at 0.6. Below that point, a small increase in the incentive adds more value than cost. Above it, the extra cost exceeds the extra value. This result belongs to the invented coefficients and cost function; 0.6 is not a recommended bonus percentage.
The payments still have to work
Joint surplus combines the business’s value and the specialist’s action cost. Compensation is a transfer between the parties, so it cancels when their payoffs are added. The business still has to fund the payment, and the specialist still has to accept it.
At the 0.6 slope, variable compensation is 3.6. If the base payment is zero, the business receives 3.6 of value and pays 3.6, leaving it zero. The specialist receives 3.6, incurs 1.8 of action cost and keeps a payoff of 1.8. Together they have the calculated surplus, but its division may be unattractive to the owner.
If unrestricted transfers were possible and the specialist’s outside option were zero, a base of negative 1.8 would leave the specialist with zero and the business with 1.8. That is a formal possibility in this model. It does not establish a feasible employment arrangement.
Add a different contractual condition: the base must be nonnegative. With a zero outside option and a zero base, the business’s payoff is 6b − 10b². Its best slope is now 0.3. The actions are 0.3 and 0.9; the specialist’s payoff is 0.45, the business’s payoff is 0.9 and their joint surplus is 1.35.
That is a different optimization problem from maximizing joint surplus with freely adjustable transfers. The distinction matters before an owner calls a bonus rate optimal. Optimal for whom, subject to which feasible payments and acceptance conditions?
A real design may also face risk, wage rules, wealth constraints, team effects and objectives missing from this deliberately small model. Those require their own facts. Changing the incentive slope without specifying the rest of the arrangement can produce a confident answer to an incomplete question.
A better measure can be worth more than a stronger payment
Keep the same value and action-cost assumptions, but suppose a new, feasible scoring process can give both actions a weight of 2. The paid score becomes 2a1 + 2a2. This is a stipulated alternative measurement technology, not an assumption that the business can suddenly observe everything it values.
At a slope of 1, the specialist now chooses 2 units of each action. They create value of 8 at an action cost of 4, leaving joint surplus of 4. The revised measure supports a much better result than the original score’s best surplus of 1.8.
It still does not achieve the unconstrained first-best action combination of 3 and 1, which would yield surplus of 5. One score and one bonus slope cannot independently tune both actions. The new score is better aligned, but it still compresses two choices into one incentive instrument.
Now charge the business 3 per period to operate that new measurement process. Its net joint surplus falls from 4 to 1, below the original measure’s 1.8. A better incentive signal can be too expensive to collect, verify or administer. The example supplies that cost; it does not estimate the cost of a real review process.
This creates three substantive alternatives. The owner could lower the weight on the existing measure, improve the measurement technology or change which actions the role is meant to encourage. They affect different parts of the problem and may have different costs. A larger bonus is only one available adjustment.
Ask what a person can change
A historical association between a score and a business outcome can be reassuring. It may still be a weak guide to paying on the score. The relevant question is what an employee can do to increase the measured result, and how those particular actions affect the business.
In the fictional operation, perhaps both the score and overall results tend to rise during a busy season. That co-movement would not repair the reversed action weights. An owner would need to understand the choices encouraged at the margin, including what the measurement process leaves out.
Start with a concrete proposed action: another initial proposal, an improved instruction, an extra inspection or a follow-up conversation. Ask how the paid score changes if the person does more of it. Then ask what would have to happen for the business to benefit. A score that cannot distinguish those paths needs a more careful incentive than its apparent precision suggests.
State the valuable actions and paid measure separately, identify the distortion a stronger payment would amplify, and check the feasible compensation and participation conditions. The owner can then judge whether the better investment is more intensity, a different signal or a different job design.
Explore Infinite Upside
For Vijay Sheth’s personal accounts, read Infinite Upside: Building Wealth With Room to Live, published by Sheth Capital, Inc.
Compare incentive and participation constraints
Model incentives when effort is hard to observe