How do you read and maintain a bill of materials?

A production list is only useful if everyone is working from the same version.

The prototype worked. The customer placed an order. Then someone ordered screws in the wrong length, the packaging supplier received an old artwork file and the assembly team built from a spreadsheet nobody could quite identify.

A bill of materials, or BOM, is the structured list of parts and materials needed to make a product. It can connect the product’s components, quantities, units and revisions to the people buying, building and checking them. To use one well, identify the specific product and version, check the units and quantities, control changes and compare the list with what the factory actually consumes.

A BOM is not the entire production plan. It does not by itself tell you whether a supplier has stock, how long assembly takes or whether a product is profitable. It is one essential map of what goes into the product—and a surprisingly expensive place to be vague.

What goes on the list?

NASA’s archived product-data guidance defined a bill of material as a listing of the component parts and materials for one instance of a product, including identifying information, quantities and units. That 2011 document is obsolete and is cited only for its definition, not as current NASA procedure; a small manufacturer can choose a simpler system while using the underlying idea.

For each component, record a stable identifier and a description specific enough to distinguish it from a similar part. Add the quantity per finished unit, unit of measure, applicable revision and any approved specification. Depending on the operation, supplier information, lead time, approved alternatives and notes on traceability may live in the same system or in linked records.

Identify the product version at the top. A list titled “lamp parts final” tells the next person very little when three files are named “final,” “final new” and “final actually.” A product identifier, revision and release status make the list usable outside the meeting where it was created.

A fictional run of 500 desk lamps

Suppose a fictional lamp requires one housing at $8, one circuit board at $6, two fasteners at $0.25 each and one package at $2. At those fictional unit prices, the direct listed material per lamp is $8 + $6 + (2 × $0.25) + $2 = $16.50.

For 500 finished lamps with no scrap or extra stock, the listed requirement is 500 housings, 500 boards, 1,000 fasteners and 500 packages. At the assumed prices, those materials cost 500 × $16.50 = $8,250. This is a materials calculation, not the cost of producing or selling the order. It excludes labor, freight, taxes, tooling, inspection, overhead, rejected material and other costs.

Now suppose the team plans for a 5% loss of circuit boards and wants 500 usable boards after that loss. Under this simplified yield assumption, 500 ÷ 0.95 = 526.32, so it would need to round up to 527 boards if boards are purchased individually. At $6 each, those boards cost $3,162, or $162 more than 500 boards. Other items remain unchanged in this illustration, giving a revised materials estimate of $8,412 before any other costs.

That is different from simply buying 5% extra, which would be 525 boards. The right planning method depends on whether the stated percentage means expected loss from inputs, an allowance added to finished demand, or something else. A historical average is not a guarantee; use actual yield data and buying constraints where available.

Make assemblies and units explicit

A product may include a subassembly that has its own parts. A lamp head, for example, might include the circuit board, lens and fasteners. Decide whether the BOM lists that head as one purchased assembly, expands it into components for internal assembly, or uses linked levels. The structure should match the work and avoid counting the same material twice.

Units matter as much as numbers. “Two” could mean two screws, two bags of 100 or two meters of wire. When a supplier sells material in rolls but the BOM uses meters per unit, record the conversion, minimum order and practical cutting losses separately. A perfectly correct quantity per lamp can still produce the wrong purchase order if the conversion is wrong.

Ask which items are supplied by the customer, supplied by the manufacturer or included in a subcontractor’s price. Identify packaging, labels and instructions where they are necessary for the deliverable. An ingredient that costs a few cents can still stop a shipment if it is missing or has the wrong language.

Which revision is approved?

A design can change after a quote but before a production run. Assign a revision to the relevant drawing, specification and BOM, and make clear when an approved change becomes effective. Does the new fastener apply to every future unit, only to a specific order, or after existing inventory is consumed? The answer should be recorded and communicated to the people who buy and build.

NASA’s quality-assurance guidance discusses configuration control and traceability for manufactured items and constituent parts in its own work. A small company need not copy a space program’s procedures; the useful discipline is knowing which version was approved and which version was actually built.

Separate a proposed change from an approved one. Record who requested it, why, the cost and timing implications, who approved it and which orders or inventory are affected. If a spreadsheet is the source of truth, define where the released copy lives, who can edit it and how the team is told when it changes. A complicated software system is not a substitute for clear ownership.

Keep an audit trail rather than overwriting the only copy of an old specification. If a customer later reports a problem, the team needs to know what went into that particular lot, not merely what the BOM says today.

An available substitute is not automatically an approved one

A supplier may offer a visually similar part with a different material, tolerance, rating or certification. Purchasing can identify the option, but the people responsible for design, safety, quality and the customer agreement should decide whether it is acceptable for the intended use. Who approves a change and what testing is required depend on the product and agreement.

Record the approved alternative’s part number, limitations and effective orders. If a substitute is permitted only for a specific lot or customer, make that limit visible. Do not silently change a part description to “equivalent” and leave the assembly team to guess.

A substitute can also change economics beyond the unit price. It might require a different tool, introduce rework, alter packaging or delay certification. Compare the total effect and lead time, not just the line-item quote. If a change is temporary, record when and how the original specification will be restored.

From BOM cost to a useful estimate

The BOM can provide a materials starting point. A usable production estimate also needs purchase prices, supplier minimums, freight, duties or taxes where applicable, conversion costs, expected yield, inspection, packaging, labor and other relevant expenses. Some costs may be fixed per run; others vary with each unit. Show the assumptions separately so a change in order quantity does not quietly distort the result.

For the fictional lamps, a supplier may sell fasteners in bags of 600. A need for 1,000 fasteners would require two bags, or 1,200 fasteners, if partial bags are unavailable. Whether the remaining 200 become usable inventory, expire or are specific to this customer affects the business decision. Do not automatically charge the entire purchase to one order or assume every leftover will be used.

Compare quoted prices with the units in the BOM. A quote of $30 per hundred fasteners is $0.30 each before other charges, not $30 each. Record the quote date and validity period; an old component price is not a current supplier commitment. If a long lead-time component has an uncertain price, model a range and identify who bears the risk in the customer contract.

Compare the plan with the build

During a pilot run, ask operators which parts they actually use, what goes wrong and whether the instructions match the released BOM. A planned quantity can miss a washer, a test fixture consumable or an extra label needed for a specific destination. A discrepancy is useful information, not a reason to hide the difference in an untracked spreadsheet.

Distinguish an approved design change from a one-time repair, scrap or substitution. Record actual quantities and lot or serial information when the product and risk require it. Compare actual consumption with the expected quantities after the run, investigate meaningful differences and update the appropriate controlled record.

When a component fails, traceability can narrow which products may be affected. The level of detail needed for a decorative desk lamp differs from a medical device or safety-critical component. Industry rules, customer contracts and applicable standards may require particular records or approvals; the team should determine those requirements for its product.

A simple ownership routine

Give someone responsibility for the released product structure, and give purchasing, manufacturing and quality a way to flag problems. Before a purchase order or production release, confirm the product and revision, make-versus-buy decisions, approved components, quantities, unit conversions and effective date.

When a change is approved, tell the people holding old purchase orders or inventory what to do. A supplier who never received the revision cannot be expected to ship against it. A receiving team also needs to know which version is acceptable. Save acknowledgments where they matter.

For a small team, this routine might fit on a shared sheet with protected released versions and a change log. A larger operation may need linked inventory, engineering and planning systems. Choose enough control to make the right information easy to find; avoid building an elaborate system that no one updates.

A good BOM gives everyone the same starting point. Its value shows up when a component changes, a supplier calls with an alternative or a customer asks what went into a particular batch—and the answer is easy to find.

Explore Infinite Upside

For Vijay Sheth’s personal accounts, read Infinite Upside: Building Wealth With Room to Live, published by Sheth Capital, Inc.

Find your edition · Chapter companion

ABOUT THE CONTRIBUTOR

Luna Lim

DIRECTOR OF FINANCIAL RESEARCH & EDITORIAL STRATEGY

SHETH CAPITAL, INC.

Luna Lim writes about business, investing, and the judgment behind financial decisions. She joined PCH Exotics Inc. as Director of Operations in 2022, working across La Jolla and Miami. Today, she reports directly to Vijay Sheth at Sheth Capital, Inc., bringing an operator’s perspective to the ideas she covers.

Based in Pacific Beach, California, Luna is curious about the people behind the numbers: what they’re building, how they weigh uncertainty, and what makes a risk worth taking. Her articles for Infinite Upside follow those questions through the details, with clear explanations and a feel for how decisions play out in everyday business.