A project report labels one annual energy figure P50 and a smaller figure P90. The smaller one sounds more pessimistic. Its larger percentage sounds more reassuring. Then a presentation calls it a “90% confidence case” and applies the number to every year of a twenty-year investment.
Several different claims have slipped into the room. An energy-yield P90 commonly identifies a quantity expected to be met or exceeded with 90% probability under the specified model. It does not mean 90% of the larger P50 quantity, a 90% chance that the business succeeds, or a promise that every year clears the same floor.
The outcome, time horizon and included uncertainties belong beside P50 or P90. A lower-tail annual energy estimate and an estimate for a long-term average can have different distributions even when they concern the same plant.
Which tail is being described?
The energy-yield convention is an exceedance convention. For a continuous distribution, P90 energy corresponds to its lower tenth-percentile boundary: most modeled outcomes lie above it. P50 is the median. It equals the mean for a symmetric normal distribution, but “median” and “mean” are not generally interchangeable words.
This is the opposite end from a high-duration percentile on a service dashboard. A p90 waiting time is usually an upper-duration location, with most observed waits below it. The turnaround-percentile guide addresses that observation-based calculation. The percentage alone does not identify which convention a report uses.
Current SAM P50/P90 documentation describes annual energy values generated from multiple weather years. It also says Detailed PV and PVWatts use a separate Uncertainty option. The Uncertainty documentation explicitly distinguishes Year 1 annual energy, interannual variability, input-source uncertainty and their combined effect. A result labeled P90 without the selected model and included sources has discarded useful information.
Those documentation pages describe particular software features, not a universal requirement that every assessment use the same distribution or weather record. The interpretation still depends on the method actually used for the reported result.
A supplied normal model shows the direction
Use an invented teaching model in which one future year’s energy is normally distributed with mean 100 GWh and standard deviation 8 GWh. Treat that distribution as a stipulated mathematical approximation, not a fitted assessment or a physical guarantee. Its median is 100 GWh.
The lower tenth-percentile normal boundary is approximately 1.28155 standard deviations below the mean. Thus P90 energy in this model is 100 − 1.28155 × 8, approximately 89.75 GWh. The calculation does not multiply the mean by 90%.
If a second supplied model has the same mean but standard deviation 4 GWh, its P90 is approximately 94.87 GWh. Both have P50 of 100 under the symmetric assumptions. The higher P90 in the second model reflects a narrower distribution, not more average energy.
The historical 2012 SAM methodology paper explains normal-distribution and empirical approaches, and why the choice matters. Its simulations used an older software version and specific weather records. Their results are not current project estimates. A normal formula should not be imposed merely because its arithmetic is convenient.
An empirical method estimates a distribution from the supplied outcomes instead. Its quantile convention, sample size, excluded years and treatment of unusual weather can affect the result. A weather file chosen to represent a typical year has a different job from a collection intended to represent year-to-year variability. One typical file cannot reveal a tail simply by being repeated twenty times.
Twenty individual years are not a twenty-year average
Retain the invented 100 GWh mean and 8 GWh annual standard deviation. Now add strong assumptions: annual variations are independent, the distribution stays unchanged for twenty years, and there is no degradation, structural change or additional uncertain parameter.
Under this model, the standard deviation of the twenty-year average annual energy is 8 divided by the square root of 20, approximately 1.78885 GWh. The average’s P90 is approximately 97.71 GWh per year. That is a different outcome from the 89.75 GWh P90 for one year.
Multiplying that average by twenty gives a total-energy outcome with consistent units. It does not turn the average’s lower boundary into a floor for each individual year. Some years can lie below the long-term average while the twenty-year average meets the stated quantity.
There is another distinct event: every one of the twenty individual years meets the single-year P90 threshold. Under the stipulated independence and unchanged 90% annual exceedance probability, that event has probability 0.9 to the twentieth power, approximately 12.16%. The probability of at least one year falling below it is approximately 87.84%.
Those probabilities are consequences of the invented model, not a forecast of a renewable plant. They expose a language error. “Ninety percent for one year,” “ninety percent for the twenty-year average” and “ninety percent that every year meets a floor” are three separate statements.
Independence is doing considerable work. Weather persistence or other common influences can change the long-horizon distribution. An analyst cannot earn the square-root-of-twenty reduction merely by placing twenty calendar years in a spreadsheet.
A shared uncertainty does not average away
Consider a separate supplied model. Annual energy equals 100 GWh plus a common uncertain offset plus an annual weather variation. The common offset applies to every year of a simulated project path. Give it a normal distribution with mean zero and standard deviation 4 GWh. Give each independent annual weather variation a normal distribution with mean zero and standard deviation 8 GWh, independent of the offset.
The common offset is a mathematical illustration of a persistent modeling uncertainty, not a measured bias or a claim that real errors follow this distribution. It could represent an uncertain level in the teaching model. Drawing a new offset for every year would create a different model and remove the persistence we are examining.
One year’s combined variance is 4² + 8² = 80, giving standard deviation approximately 8.94427 GWh. Its normal-model P90 is approximately 88.54 GWh.
For the twenty-year average, the annual-weather variance falls to 8² ÷ 20, but the common-offset variance remains 4². Their sum is 19.2, and the standard deviation is approximately 4.38178 GWh. The average’s P90 is approximately 94.38 GWh per year.
That is lower than the weather-only average’s 97.71 GWh because this second model includes a persistent uncertainty the first omitted. More years smooth the independently varying component; they do not reveal or remove the common offset. A longer horizon can therefore narrow one part of uncertainty without justifying the most reassuring possible total range.
A consistent known bias would require another treatment again. Calling a known modeling overstatement “random variation” does not correct the central estimate. The analyst needs to explain whether a factor changes the expected level, its uncertainty, year-to-year variation or some combination.
The number is conditional on the assessment
The SAM Uncertainty page makes this distinction concrete by displaying separate results for weather variability, input-source uncertainty and overall uncertainty. Its P-values can differ because the graphs include different sources. It explicitly defines annual energy there as Year 1 total electrical output, rather than silently applying one unchanged figure over the whole project life.
A reader of a project assessment should therefore be able to identify the modeled energy boundary and horizon before interpreting a probability. Does the output describe generation before or after specified losses? Which uncertainty sources enter? How do degradation, availability or curtailment enter the model, if at all? A missing factor is not necessarily hidden inside the reported P90.
The same caution applies when comparing two assessments. A lower P90 can result from a lower central estimate, a wider distribution, more included uncertainties or a different horizon. It is not automatically proof that the assessor chose less capable equipment.
A useful comparison holds the question constant and explains the bridge between methods. If one estimate describes weather variation alone and another includes additional uncertain inputs, placing their P90 values in the same column does not make the scopes equivalent.
Energy is not the project outcome
Even a well-supported annual energy distribution does not supply a probability of profit. Revenue depends on timing, prices, delivery and contracts; project cash depends on expenses, financing and obligations as well. A probability about one energy quantity is not a probability about all those combined outcomes.
If every generated unit in an invented case receives the same positive fixed price, with no other changes, multiplying energy by that price preserves the ordering for that narrow gross-receipts calculation. When price, volume eligibility or other conditions vary, that simple transformation may no longer describe the result. The actual commercial model has to establish the relationship.
A statistical confidence interval for an estimated mean is another different object, as the mean-and-prediction guide explains. A report should not switch between a modeled energy quantile and a confidence interval merely because both are described with percentages.
P90 can be a useful conservative energy case within a defined model. Its value comes from preserving what is being predicted and why the lower tail has that shape. The label becomes much less reassuring when it is asked to guarantee twenty individual years, repair a missing uncertainty source and certify the whole investment at once.