INFINITE UPSIDE

Business decisions

How Do You Run a Project Premortem That Helps?

Imagine the project failed. Then give the team something useful to do with that idea.

The project plan has a launch date, a budget and a room full of people who would rather not be the one to spoil the meeting. A premortem gives those people a different assignment: imagine the launch has failed, then explain what could have caused it.

A project premortem is a structured discussion of plausible failure paths before the work is complete. It can surface assumptions, dependencies and early warning signs while the team still has time to change the plan. It does not predict the future or prove that every important risk has been found.

The useful output is not a list of imaginative disasters. It is a small number of specific changes, owners and checks tied to a plan the team can still act on.

Give the team a real plan to examine

Begin with the decision, scope and current schedule. What is the team trying to deliver, by when and for whom? Which resources, approvals and dependencies does the plan assume? If people are imagining different projects, their failure stories will be difficult to compare.

In Gary Klein’s project-premortem description, participants assume the project has failed and generate plausible reasons. The exercise is a way to invite concerns before a decision becomes harder to revisit. It is not evidence that every group using the method will succeed.

Define the failure being considered. A launch can miss its date, reach customers with a serious defect, exceed the budget or meet the schedule while the intended users cannot use the service. Those outcomes may have different causes and owners. Choose the decision and time horizon before asking for explanations.

Let people think before the room agrees

Give participants a short period to write their own possible causes before discussing them. Include people who understand operations, customers, technical dependencies and approvals. The person who will support the launch at 2 a.m. may notice a different weakness from the person presenting the slide deck.

Ask for a causal path, not a label. “Communication failed” is a place to start. “The supplier changed the delivery date, but nobody updated the installation contractor, so the crew arrived before the equipment” gives the team something it can examine.

Make it safe to identify a concern without requiring a participant to prove the plan will fail. At the same time, distinguish a known fact from a scenario. The point of imagining a failure is to test the plan, not to announce that a supplier has already missed a delivery.

Follow one possible failure

Imagine a small company planning to open a new service location on June 1. Its schedule assumes that equipment arrives May 15, an installer completes setup in four working days and the final inspection is available before opening. Those are the plan’s assumptions, not facts about any real project.

A participant proposes a failure path: the equipment arrives May 22 rather than May 15; the installer has already moved to another project; the inspection cannot happen until setup is complete; the location opens late. The team should check each link. Is the delivery date confirmed? What commitments exist with the installer? How is an inspection requested, and what notice is required?

The response might be to confirm a delivery milestone, agree on a backup installation window and identify the last date at which inspection can be scheduled without moving the target opening. Those actions need an owner and a date. “Watch the supplier” is not a complete mitigation if nobody knows who will call or what answer would trigger a change.

If the supplier has already confirmed a different date, replace the assumed scenario with the actual record. A premortem should improve the shared picture, not preserve an entertaining story after better evidence arrives.

Choose what deserves action

Group repeated concerns and look for common dependencies. Three different failure stories may all rely on one employee, one untested data transfer or one approval that has no confirmed date. Addressing the dependency can be more useful than maintaining three differently worded rows.

Consider the consequence, how soon the team would learn of a problem, what can be done now and what the response costs. Precise probabilities may not be available. Do not invent a 27% chance because a template has a percentage column. A range, a qualitative assessment or an explicit unknown can be more honest if the evidence is limited.

Watch for connected effects. A late equipment delivery may also extend rent, delay staff training and shift customer commitments. Do not count the same cost twice, but do ask which costs sit outside the project budget. A vendor’s change order may not include the business revenue that was expected from opening.

Turn the discussion into decisions

For each issue the team chooses to address, record the specific action, responsible person, due date, evidence of completion and escalation trigger. If the team accepts a risk, record the decision and the conditions under which it should be reconsidered. An owner can accept an uncertainty; a spreadsheet cannot accept one on anyone’s behalf.

Link the outcome to the project’s existing decision and action records. The decision-log guide covers how to preserve an approved choice and later changes. A premortem generates possible failure paths; the log shows what the team decided to do about them.

Revisit the most important assumptions at natural milestones. If the supplier confirms shipment, inspection rules change or the project scope moves, update the actions. Do not rerun an hour-long exercise every week merely to keep a calendar appointment.

Questions for a better session

  • What specific outcome are we imagining failed, and by when?
  • Which assumptions must hold for the current plan to work?
  • What plausible sequence connects a failure to those assumptions?
  • Who has evidence that supports or challenges that sequence?
  • What early signal would give the team time to respond?
  • Which action is worth taking now, who owns it and when will it be checked?

A good session gives the team permission to say the uncomfortable thing while there is still a practical response. Then it puts the response somewhere more durable than the meeting’s collective memory.

Explore Infinite Upside

For Vijay Sheth’s personal accounts, read Infinite Upside: Building Wealth With Room to Live, published by Sheth Capital, Inc.

Find your edition · Chapter companion

ABOUT THE CONTRIBUTOR

Luna Lim

DIRECTOR OF FINANCIAL RESEARCH & EDITORIAL STRATEGY

SHETH CAPITAL, INC.

Luna Lim writes about business, investing, and the judgment behind financial decisions. She joined PCH Exotics Inc. as Director of Operations in 2022, working across La Jolla and Miami. Today, she reports directly to Vijay Sheth at Sheth Capital, Inc., bringing an operator’s perspective to the ideas she covers.

Based in Pacific Beach, California, Luna is curious about the people behind the numbers: what they’re building, how they weigh uncertainty, and what makes a risk worth taking. Her articles for Infinite Upside follow those questions through the details, with clear explanations and a feel for how decisions play out in everyday business.

More from Luna Lim

The Infinite Upside store