The supplier makes your product. The mold that makes the product sits in the supplier’s building. You paid for it three years ago. Then someone asks a very practical question: if you change suppliers, can you actually take the mold with you?
Tooling ownership and tooling access are related but separate questions. A supply agreement can specify who owns a mold, die, jig or fixture, who may use it, who maintains it and what happens when the relationship ends. Paying an invoice is important evidence, but the agreement and applicable law determine the parties’ rights. Check the paperwork before a disruption makes the answer urgent.
There is another detail hiding inside the metal: owning the physical tool does not necessarily mean owning every design, process or intellectual property right needed to use it elsewhere.
Start with the actual equipment
Build an inventory of each dedicated tool, including its identification number, physical location, product and part numbers, current custodian and condition. Match the list to purchase orders, invoices, payment records, acceptance documents and the relevant supply agreement. If tooling has been modified, record what changed and who authorized and paid for it.
A single product can depend on more than one item: molds, spare inserts, inspection gauges, fixtures, software settings and production documentation. A list that says “one mold” may not tell a replacement manufacturer enough to run the product. Equally, shared equipment used for several customers may be owned and treated differently from a dedicated mold.
Do not assume that a production line belongs to the customer because one component on it does. Identify the physical assets separately from general-purpose machinery and the supplier’s own equipment.
Ownership, custody and permitted use
Read the agreement’s definitions and exhibits together. Does title pass when the tool is ordered, paid for or accepted? Is the asset specifically listed? May the supplier use it only for your orders? Who bears loss, damage, storage and maintenance costs? What happens if a tool is repaired, replaced or moved to a subcontractor?
A supply agreement filed with the SEC offers one example: it provides for a separate mold custody agreement and says the purchasing party acquires title while certain intellectual property in the molds belongs to the supplier or licensor. Another filed manufacturing agreement allocates ownership to the purchaser and, under its particular terms, risk of loss to the supplier while equipment is at its facility. These documents show different negotiated provisions, not rules that apply to every supplier.
Confirm whether the agreement requires identification tags, periodic inspection, insurance or a separate custody record. A tag alone does not resolve every legal question, but a clear identification record can help both parties locate the right assets and reconcile their records.
The design question is not a footnote
A physical mold, CAD files, technical drawings, specifications, production parameters and trademarks can involve different rights. The supplier may own background technology or license a design from another party. The customer may own product specifications while the supplier owns process know-how. The signed documents should be read for the particular combination, including any rights that survive termination.
That matters when planning a transfer. Receiving the mold does not automatically give a new manufacturer the right or the information to reproduce all associated tooling or use proprietary production files. Conversely, a contractual license may provide a defined right to use material without transferring ownership. Document which files exist, who holds them, the permitted use and any conditions for delivery. Engage qualified counsel on ownership, licensing, liens and insolvency questions rather than treating a checklist as a legal conclusion.
A lower unit price can hide a tooling bill
Assume a buyer pays $120,000 for a dedicated mold and expects to order 240,000 units over the relevant planning period. If the entire cost is allocated evenly for a simple purchasing comparison, the tooling amount is $0.50 per unit. If the quoted $2.00 part price excludes the separately paid mold, it represents $2.50 per unit including that illustrative allocation, before freight, defects, maintenance, taxes and financing costs.
This is a comparison tool, not an accounting instruction or a promise about the number of units the mold can produce. If actual volume is only 120,000 units, the same $120,000 divided by those units is $1.00 each. Tool life, replacement inserts and residual value can change the economics. Keep the volume assumption visible when comparing quotes, especially if one supplier embeds tooling in the part price and another charges it separately.
If a supplier funds the asset and recovers its cost through the unit price, ask what happens if volumes fall short or the contract ends early. An unamortized balance, buyout price or minimum-volume commitment may be specified, but its amount and applicability depend on the actual agreement. Avoid treating an estimated recovery amount as an automatically enforceable debt.
Who keeps it usable?
Ownership is less useful if the mold cannot produce acceptable parts. Assign responsibility for preventive maintenance, cleaning, storage, calibration, replacement components and inspection. Set a process for reporting cycles, wear, damage and out-of-tolerance output. Identify who can authorize a repair and whether a repair changes the tool or product specification.
Insurance needs the same specificity. Ask what coverage exists, who is insured, which assets and locations are included, applicable deductibles and exclusions, and how claims are handled. A contract obligation to insure and an insurance policy actually responding to a loss are separate matters.
When the supplier uses subcontractors or stores equipment off-site, maintain the current location and responsible custodian. A list last updated before the supplier opened a second plant is not much comfort during a shutdown.
Plan the exit while everyone is still cooperating
Review notice requirements, return or access provisions, outstanding payment disputes and the process for safely packing and moving equipment. Ask whether the tooling can physically fit and operate at another facility, whether setup files and qualified personnel are available, and what testing the receiving manufacturer will require. Allow time for inspection, commissioning and product qualification before promising an uninterrupted transition.
Some contracts may provide access or return rights subject to specified conditions. An SEC-filed accommodation agreement illustrates one negotiated arrangement for access to customer tooling in a particular distressed-supplier context. It is not a general right to enter a supplier’s premises or remove property. Potential liens, insolvency proceedings and local law can complicate an otherwise clear contract; obtain advice before acting.
A good handoff packet includes a current asset schedule, drawings and permitted files, maintenance records, condition photographs, spare parts and the relevant commercial documents. Agree on who pays for removal, transport, repair and requalification. A nominally free mold transfer can become expensive quickly if the receiving plant needs new adapters and six weeks of trial runs.
Questions to settle before the purchase order
- Exactly which tools are dedicated, and how are they identified?
- When does title pass, and what rights survive termination?
- Who holds the design files, and what use is licensed?
- Who maintains, insures and replaces each asset?
- What volume, buyout or unrecovered-cost terms apply?
- How can the assets and necessary records be transferred safely?
Keep a clear record of what the buyer paid for, where the tools are and what rights remain if the supply relationship changes.