Before removing an expense, find out what would stop happening with it. The answer may reveal a cheaper way to do the work, a responsibility that can end, or a cost the business still needs to carry.
That question runs through the Sheepey Exotics turnaround in Infinite Upside. A smaller fleet was still supporting commitments made for a much larger operation. Changing the cost structure was necessary. A vehicle handoff, however, did not disappear because a storefront closed.
The line in the accounts is only the beginning.
Consider a hypothetical rental branch with a staffed counter. Its rent and wages are visible. The counter may also provide somewhere to inspect a vehicle, explain an agreement, handle a delayed arrival and leave a problem for the next shift. Some of that work will be documented. Some may depend on a person who remembers what happened yesterday.
Closing the counter removes a place and changes several jobs at once. Another location might serve customers better. Deliveries might make the counter unnecessary. Neither possibility can be evaluated solely by deleting the rent from a forecast.
The useful comparison includes the replacement arrangement. Who meets the customer? Where can the inspection happen? How will the next person find an unresolved issue? If those answers require more driving, extra staff time or repeated founder intervention, some of the apparent saving has moved elsewhere.
Make the smaller operation complete.
In the memoir, vehicle sales, premises changes and staffing decisions belong to the same turnaround. A smaller fleet needs a different amount and shape of support. Retaining an organization built for a larger fleet can consume cash; leaving too little capacity to fulfill bookings can damage the revenue the company needs.
A general instruction to reduce overhead leaves the remaining operation undefined. Employees need to know which work ends, which responsibilities they inherit and how they will have time to carry them.
The layoffs in the memoir disrupted people’s households. Later rehiring allowed some employees to return, but it did not undo the period without those jobs. The turnaround and its human consequences belong in the same account.
Try the handoff before counting the saving.
Choose one recurring cost in a real operation, or use the hypothetical counter. Write its invoice description at the top of a page. Under it, describe the last ordinary day of work it supported. Include interruptions and exceptions, rather than only the formal job description.
- Mark the activities that can genuinely end.
- Give each continuing activity a person, place and workable means of completion.
- Identify what the replacement consumes, including time from somebody already carrying another role.
Then follow one customer through the proposed arrangement. A useful test is a slightly inconvenient case: the customer is late, an item is unavailable, or a shift changes before the work is complete. An arrangement that works only when nothing goes wrong may not yet be ready to replace the expense.
The result might support the cut. It might reveal a better cut somewhere else. Either is more useful than a saving whose missing work returns as an emergency.
Read alongside the book
Chapter 6, Buying a Business That Was Losing.
Original commentary and discussion material. Read the full personal accounts in Infinite Upside: Building Wealth With Room to Live, by Vijay Sheth.
Take one operating decision to the notebook.
A Decision Notebook