Reported train speed and a shipment’s door-to-door transit time measure different things. A train-speed series can exclude intermediate terminal time and whole categories of train. The customer’s elapsed time can also include origin, terminal, interchange and delivery stages. Improvement in one measured interval does not establish improvement in the complete trip.
First establish which clock the dashboard is running. An average for a defined set of trains is not a time stamp for the car you are waiting to unload.
Read an actual methodology
The Union Pacific methodology dated March 1, 2022, currently linked from the STB’s rail-service-data page when checked for this article, defines its train-speed measure as train miles divided by origin-to-destination hours less intermediate terminal time. It excludes yard, local, passenger, foreign and maintenance-of-way train categories.
The same two-page document defines terminal dwell separately, with specified beginning and ending events and exclusions. Cars passing through on run-through trains are among the exclusions. The point is not that the missing time was unimportant. It is that a defined metric was constructed to answer a particular operational question.
Keep the dated methodology attached to a comparison. The document also identifies changes to event definitions and reporting processes. A series crossing a definition change needs that context before a reader interprets the whole movement as a change in service.
Put two clocks on one page
Consider two invented trips over the same 600 measured line-haul miles. For this deliberately simplified example, divide those miles by the speed assigned to the measured interval. Separately supply all other elapsed time. These are assumptions for understanding the clocks, not reconstructions of a real shipment or the actual system-wide STB calculation.
Scroll to see the full table.
| Interval | Trip A | Trip B |
|---|---|---|
| Measured miles | 600 | 600 |
| Assumed speed within that interval | 20 mph | 25 mph |
| Time within that interval | 30 hours | 24 hours |
| Other supplied elapsed time | 30 hours | 42 hours |
| Complete modeled trip | 60 hours | 66 hours |
Trip B saves six hours inside the measured interval: 600 ÷ 25 is 24, versus 600 ÷ 20 equal to 30. It adds twelve hours elsewhere. The complete trip takes six hours longer. There is no contradiction and no need to invent a failure in the speed calculation.
These inputs do not identify where the added twelve hours occurred. An actual investigation would need the shipment’s events. Calling all of it “terminal dwell” without checking would merely replace one unsupported conclusion with another.
A system average introduces another boundary
Even if the speed metric covered every stage you wanted, a system average would still describe a population rather than your one movement. Traffic on other routes and in other service types can change the aggregate. The same shipper can therefore experience a different result without proving the system figure is wrong.
Nor can a customer divide its shipment distance by an overall train-speed average and obtain a promised transit time. The denominator, route, event boundaries and service categories may differ. Distance may itself have different definitions in the records. Preserve the actual reported units rather than substituting whatever mileage appears on the nearest map.
A shipment chronology needs its own start and finish. A customer planning production may need the interval from supplier release to material available for use. A carrier-service discussion may use a different agreed pair of events. The supplier lead-time guide explains that business clock; the rail methodology establishes which reported rail intervals fit inside it.
Check whether the week is complete
The STB service-data page also publishes reporting notes. A November 5, 2026 notice describes missing CSX data for October 27–29 in reports for the week ending October 30 after a system outage. That is a specific documented reporting gap, not evidence about every carrier or every week.
A comparison involving that record should retain the notice and any subsequent restatement. Missing observations are not automatically zero-delay or zero-traffic observations. Establish whether the chosen file was subsequently restated before using it.
For a chosen comparison, record the carrier, reporting weeks, metric definitions, relevant changes and known gaps before calculating a difference. If the available periods are not compatible, say what prevents the comparison. A number can be precisely copied and still be unsuitable for the question.
Investigate the interval that changed
For the fictional Trip B, the next useful evidence is the chronology of the added time, not another division of 600 by 25. Identify arrival, release, interchange and placement events where they apply, state which are confirmed, and compare the stages using compatible definitions. Do not infer cause from a long interval alone.
The business can then ask a bounded question: which part of this movement changed, what explains it, and what action is actually available? That gives the speed statistic a useful role without making it answer for an entire shipment it never measured.
Explore Infinite Upside
For Vijay Sheth’s personal accounts, read Infinite Upside: Building Wealth With Room to Live, published by Sheth Capital, Inc.
Read the related guide
Supplier Lead Time: When Does an Order Become Usable?