Why can wholesale electricity prices differ by location?

A single grid can have many electricity prices. Location, time and physical constraints help explain why.

Two customers use the same amount of electricity at the same time. One location has a wholesale energy price of $30 per megawatt-hour; the other has a price of $75. They are on the same grid. What happened?

The short answer may be location. Electricity must reach a particular place through a network with physical limits. When the next increment of demand cannot be served in the same way everywhere, wholesale prices can differ across that network. Those prices are called locational marginal prices, or LMPs.

They are not the same thing as a household’s final electric bill. They are a way certain organized wholesale markets price energy at particular locations and times. Understanding that distinction makes the numbers far more useful—and prevents an impressive-looking price chart from doing a lot of work it was never designed to do.

A grid is a network, not one giant extension cord

Imagine an inexpensive power source on one side of a transmission constraint and a concentration of demand on the other. Even if the first source has energy available, the grid may not be able to move additional power through the constrained part of the system under the applicable operating limits. The operator may need a different combination of resources to serve an increment of demand at the constrained location.

That does not mean electrons from one specific generator are assigned neatly to one specific customer. A real transmission network has many interconnected paths, flows and constraints. The example is a way to see the economic problem, not a complete power-flow model.

ISO New England’s LMP explanation describes how prices reflect the pattern of load and generation, transmission limits and losses. Its market uses many pricing points; an individual node, an aggregated load zone and the trading hub are not interchangeable labels.

What does marginal mean here?

In this setting, the marginal price is associated with serving an additional increment of electric load at a location, given the modeled system conditions and applicable market rules. It is not the average historical cost of every power plant on the grid, the cost of one named power line or the total bill for serving all demand.

Imagine a simplified one-hour illustration with prices supplied as assumptions, not computed by a grid model. At location A, the wholesale price is $30 per megawatt-hour; at B, it is $75 per megawatt-hour. The difference is $45 per megawatt-hour. Assume both are prices for the same hour in the same market and that there are no other settlement adjustments in this illustration.

If a hypothetical market participant’s cleared load at B is 10 MWh for that hour, the simplified energy charge is 10 × $75 = $750. At A, the same 10 MWh at $30 would be $300, a $450 difference in the illustrated energy calculation. This comparison is not a quote, a complete invoice or proof that a particular business could move its load between locations.

The unit matters. A megawatt is an output or demand rate; a megawatt-hour is an amount of energy over time. A 10-megawatt load maintained for one hour consumes 10 megawatt-hours. If it runs for half an hour at that rate, it consumes five, assuming the simplified steady output.

Energy, congestion and losses

ISO New England describes three LMP components: an energy component, a congestion component and a loss component. In its presentation, the energy component is associated with a system reference point; the other components reflect location-specific effects relative to that reference. Other market designs and definitions should be checked on their own terms.

For a purely arithmetic example, suppose one location has an energy component of $40/MWh, congestion of $20/MWh and losses of $2/MWh. Its hypothetical LMP is $40 + $20 + $2 = $62/MWh. At a second location in the same example, assume the energy component is $40, congestion is −$5 and losses are $1. The LMP there is $36/MWh.

The $26 difference is not automatically the fee to transmit electricity between those places or the profit from doing so. These are invented component values to illustrate addition; market settlements, rights and actual transmission constraints require the relevant market rules and positions. Components can be positive or negative relative to their reference. Do not assume that “congestion” must always appear as a positive number at every node.

Losses also deserve their own line. Moving electricity through a network involves physical losses. A loss component reflects a marginal pricing effect under the market’s method; it should not casually be described as a precise percentage of one customer’s delivered energy.

A price is attached to a clock

The same location can have different prices across hours and even across shorter operating intervals. Demand changes, available generation changes, transmission equipment can be out of service and forecasts can be wrong. The location label and the time interval belong beside the price.

New England has both day-ahead and real-time energy markets. ISO New England describes the day-ahead market as a financially binding schedule for the following day. Its real-time market balances actual conditions and settles deviations from the day-ahead schedule. These are related settlements, not two bills to add together for the same quantity without examining the position.

Consider a simplified hypothetical at one location: a participant has a day-ahead purchase of 10 MWh at $40/MWh, or $400. Actual consumption for the interval is 12 MWh, and assume the applicable real-time price for the 2 MWh deviation is $80/MWh. Under this simplified two-settlement illustration, that deviation adds $160, for an energy total of $560.

The 12 MWh is not all repriced at $80 in this example. Nor does the $560 include every charge, credit, adjustment or contractual arrangement that could apply to an actual participant. If actual usage had been below the day-ahead quantity, the deviation would go in the other direction under the relevant settlement rules. The ISO’s day-ahead settlement description explains its use of cleared amounts and location-specific day-ahead prices.

Wholesale price is not the price printed on every bill

A retail customer generally buys under a tariff or contract through a utility or competitive supplier, not necessarily by paying each five-minute wholesale node price directly. The final bill can include energy supply, transmission, distribution, taxes and other charges under the relevant arrangement. A fixed-price contract and a product indexed to wholesale prices can expose customers to very different price movements.

That means the $450 location difference in the earlier hypothetical is an energy-market calculation, not a claim that two households will see bills differ by $450. To assess a business location, identify its tariff, supplier contract, demand charges, usage pattern and any relevant index or pass-through provisions. Ask for a billed example rather than assuming one public market number maps directly to the meter.

Similarly, a generator’s node price is not its net profit. Operating costs, financing, agreements, other market revenues, charges and actual generation all matter. A project’s output may also differ from its nameplate capacity across hours, so a price chart alone cannot determine its annual revenue.

Why the difference between locations matters

A repeated price difference can be relevant to a developer considering where to site a project, a large customer assessing procurement or a supplier managing exposure. But a single dramatic hour cannot establish a persistent pattern. Examine the full distribution of spreads across comparable periods, including quiet hours, negative prices where present and the hours with the highest demand.

Then ask what created the spread. Was a constraint temporary or recurring? Was equipment under maintenance? Did the model or market boundary change? Is a proposed connection actually at the quoted node? A location that appears attractive in a historical chart can face different conditions by the time a project operates.

A transmission investment or new resource might change flows and prices, but its value cannot be read directly from one spread. Costs, construction timing, system studies, approvals and how the network responds all matter. A price difference is a question for analysis, not a guaranteed investment thesis.

Hedges do not remove every uncertainty

Market participants may use contracts or financial transmission rights to manage some exposure. ISO New England describes financial transmission rights in connection with hedging transmission congestion costs. The particular instrument, endpoints, quantity, interval, auction terms and settlement rules determine what a position actually covers.

Do not treat a hedge as permission to ignore basis risk—the possibility that the price relevant to the hedge differs from the price relevant to the underlying exposure. A hedge for one location, time or quantity can leave a mismatch with another. Nor should a simple price spread be assumed to equal a guaranteed payment after all market rules and costs.

For a business buying through a supplier, the equivalent practical question is often simpler: which price risks are fixed in the contract, which are passed through and which quantities or hours are covered? A careful contract review may be more useful than trying to trade an unfamiliar instrument.

Read the price like a market participant

Start with five labels: the market, location, date, interval and units. Is it day-ahead or real-time? A node, zone or hub? An average, a single interval or a modeled estimate? Does the price include the component being discussed, and are the comparison points measured on the same basis?

Next identify the question. For an energy settlement, find the cleared quantity and relevant price. For a retail bill, find the tariff and contract. For a project, connect hourly production to achievable prices and complete costs. For a hedge, compare the instrument’s exact terms with the exposure. For system planning, investigate the physical constraints and proposed changes rather than assuming a price establishes their cause.

Locational pricing makes one practical point visible: electricity has to be useful at a particular place and time. Once those two details are attached to the number, the price becomes much easier to interpret—and much harder to mistake for the answer to a different question.

Explore Infinite Upside

For Vijay Sheth’s personal accounts, read Infinite Upside: Building Wealth With Room to Live, published by Sheth Capital, Inc.

Find your edition · Chapter companion

ABOUT THE CONTRIBUTOR

Luna Lim

DIRECTOR OF FINANCIAL RESEARCH & EDITORIAL STRATEGY

SHETH CAPITAL, INC.

Luna Lim writes about business, investing, and the judgment behind financial decisions. She joined PCH Exotics Inc. as Director of Operations in 2022, working across La Jolla and Miami. Today, she reports directly to Vijay Sheth at Sheth Capital, Inc., bringing an operator’s perspective to the ideas she covers.

Based in Pacific Beach, California, Luna is curious about the people behind the numbers: what they’re building, how they weigh uncertainty, and what makes a risk worth taking. Her articles for Infinite Upside follow those questions through the details, with clear explanations and a feel for how decisions play out in everyday business.

More from Luna Lim

The Infinite Upside store