The best setting for one turbine need not be the best setting for the wind farm around it. That is the interesting business problem behind wake steering: one machine can give up some output while helping a neighboring machine recover more.
A turbine’s wake changes the flow reaching equipment downstream. The resulting losses depend on the layout and conditions. Wake steering deliberately changes an upstream turbine’s alignment to influence that wake, with the aim of improving the array’s combined result. The relevant gain is the net effect across the affected turbines, over the conditions in which the change works.
For a project reader, the task is to connect a technical result with the right population, time and cash assumptions. A striking downstream gain is a useful finding. It becomes a misleading annual forecast when those boundaries disappear.
Read the pair before the percentage
In a 2019 field paper by Fleming and colleagues, the reported increase in energy production was approximately 14% at the downstream turbine over a 10-degree wind-direction sector, while the combined upstream/downstream pair gained approximately 4%. The experiment concerned closely spaced turbines and identified site, atmospheric and modeling challenges. It was not a claim of a 14% annual gain for the whole farm.
The difference between the two percentages is the central point. Steering can change the upstream turbine’s output as well as the wake reaching its neighbor. The project cannot spend the downstream improvement without accounting for what happened upstream.
Read which equipment entered the comparison, which direction and speed conditions were included, what baseline was used and whether the result was measured or modeled. Keep uncertainty and excluded observations attached to the figure. An increase in a selected set of conditions can be valuable without being representative of every hour.
The 2026 AWAKEN benchmark paper by Bodini and colleagues provides current research context on the difficulty of characterizing wind-farm flow. Its observational case concerns August 24, 2023 and emphasizes spatial and atmospheric variability. It is a benchmark dataset study, not proof that a particular steering control will produce a stated commercial return.
An original two-turbine example
Consider two hypothetical turbines under one stated set of conditions. Without the proposed change, the upstream turbine produces 3.00 MW and the downstream turbine produces 2.00 MW. Their combined output is 5.00 MW.
In the supplied steering case, upstream output falls to 2.85 MW while downstream output rises to 2.30 MW. The downstream improvement is 0.30 MW, or 15%. The upstream reduction is 0.15 MW, or 5%. Combined output is 5.15 MW, a net increase of 0.15 MW or 3%.
Scroll to see the full table.
| Output | Baseline | Supplied steering case |
|---|---|---|
| Upstream turbine | 3.00 MW | 2.85 MW |
| Downstream turbine | 2.00 MW | 2.30 MW |
| Combined | 5.00 MW | 5.15 MW |
These are invented teaching outputs, not a turbine test or a recommended control setting. They show which total must be compared. The downstream turbine can have an impressive percentage while the array’s percentage is smaller.
Also distinguish power and energy. If those exact outputs persisted for one hour, combined energy would be 5.00 MWh versus 5.15 MWh. A real wind farm’s output changes. Integrating the differences over the actual relevant periods produces the energy comparison; a single power snapshot does not supply the annual result.
Weight the conditions that actually occur
Suppose a separate annual illustration has 100,000 MWh of baseline generation. Of that energy, 10,000 MWh comes from the conditions in which the modeled 3% net gain applies. Assume no change to the other 90,000 MWh.
The affected portion gains 300 MWh: 10,000 multiplied by 3%. The annual total becomes 100,300 MWh, an increase of 0.3%. Applying 3% to the full 100,000 MWh would claim 3,000 MWh and overstate this supplied annual gain by a factor of ten.
The 10% in this illustration is an energy share, not a statement that the conditions occur for 10% of the clock hours. Conditions contributing little energy can account for many hours, while higher-output conditions can contribute more energy in fewer hours. A proper project model needs the matched wind distribution, production and control behavior.
Check the baseline too. Does it already include estimated wake losses? Is the proposed improvement measured against that same baseline? Adding an improvement to a model that has already assumed the benefit can count it twice. Changing the baseline can also change a percentage without changing the underlying physical gain.
A model and a field comparison have different jobs
A model helps explore a proposed layout and control approach under stated conditions. A field comparison examines what happened in the measured setting. Neither should be stripped of its assumptions simply because the output arrives as a percentage.
The 2019 paper discusses differences between predictions and measured behavior, including timing in the control response and difficulties associated with the site. The useful interpretation is that implementation and environment affect the outcome. A lookup-table target and the turbine’s actual response need not be the same sequence.
Ask how the test separates control effects from changes in wind, availability, curtailment and other conditions. Which reference turbines or comparison periods are used? Are the compared samples similar enough for the intended conclusion? What observations were removed, and why?
For a commercial decision, identify whether the evidence concerns the proposed turbine models, spacing, terrain and operating environment. A result from another farm can support further investigation. It does not establish site-specific performance merely because both locations contain wind turbines.
Put the energy change through the contract
Return to the separate 300-MWh annual-gain illustration. Assume every additional MWh can be delivered and receives $40 under a supplied fixed-price arrangement. Additional annual gross revenue is $12,000. That amount depends on delivery and payment assumptions as well as the energy calculation.
Assume implementation costs $40,000 upfront and additional annual operating/support outlays are $4,000. The remaining annual difference is $8,000, producing a five-year simple undiscounted payback. These invented amounts exclude taxes, financing and other changes; they are not a forecast of project profit or an appropriate investment hurdle.
If the additional energy is curtailed, settles at a different price or changes another contractual payment, the cash result can differ. The production model and commercial contract must use consistent periods and quantities. More modeled MWh do not automatically become more collected dollars.
The VPPA guide examines one contract structure in which output and price affect settlement. Wake steering is an engineering/control question upstream of that settlement. Keep the physical gain and its commercial treatment as separate calculations.
Ask what else the change affects
The review should identify equipment compatibility, operating constraints, approved changes, monitoring, support responsibilities and any relevant warranties or agreements. Qualified project teams must evaluate the actual system. An educational percentage example cannot authorize a control change.
Also identify what must be measured after any authorized implementation: the relevant turbine and array outputs, availability, operating conditions and the baseline used for comparison. A result that cannot be reconstructed from named inputs is a weak basis for revising the business case.
If a proposal reports only an average annual gain, ask for the supporting breakdown by conditions and the evidence behind it. If it reports only the best sector, ask how much of the annual production that sector represents. Both views can be useful; neither should quietly stand in for the other.
The capacity-factor guide separates plant size from actual energy production. Here the same discipline applies within the farm: a turbine’s own output, a pair’s combined result and the project’s annual delivered energy are different measures.
The attractive argument for steering is cooperation between machines rather than a contest for the largest individual number. The investment record should preserve that argument all the way from the upstream sacrifice to the downstream gain—and then through the annual energy and payment calculations.
Explore Infinite Upside
For Vijay Sheth’s personal accounts, read Infinite Upside: Building Wealth With Room to Live, published by Sheth Capital, Inc.
Continue with a related guide
What does a power plant’s capacity factor actually measure?