Loan-to-cost vs. loan-to-value in construction financing

Two ratios can describe the same loan and produce very different limits.

A lender offers to finance 70% of a development project. The developer hears “I need 30%.” Then the appraisal comes in lower than expected, the lender excludes a cost from its calculation, and the cash requirement grows. The original sentence was short. The financing is not.

Loan-to-cost compares a loan with a defined project cost. Loan-to-value compares a loan with a defined property value. A lender may use both as limits, along with other underwriting tests. The smaller resulting loan can determine the maximum commitment in a simplified comparison. It does not, by itself, establish how much will be advanced at a given point or whether the lender will approve the project.

Inspect both denominators. “Cost” may not include every dollar the developer expects to spend, and “value” may not be the hoped-for sale price after a successful project. Ask which amounts the lender accepts, what date and condition they represent, and what the written terms require.

The ratios answer different questions

For a simple illustration, loan-to-cost, or LTC, is the proposed loan divided by an agreed project-cost figure. Loan-to-value, or LTV, is the proposed loan divided by an agreed property-value figure. A project may cost less or more than its estimated value; neither ratio can be inferred from the other without knowing both amounts.

Suppose a lender agrees, for a fictional example, to calculate the cost limit using $10 million of eligible project costs and the value limit using a $12 million prospective completed value. The $10 million and $12 million are assumptions about what this particular lender accepts, not an appraisal or a rule for actual projects.

A $7 million loan divided by $10 million of eligible cost is 70% LTC. The same $7 million divided by $12 million of accepted value is approximately 58.3% LTV. Both calculations are arithmetically correct because they measure against different bases. Neither calculation says that the project is profitable or that the loan is available.

The interagency appraisal guidelines distinguish current “as is” value from prospective value upon completion and, when applicable, value upon stabilization. Those are different opinions tied to different conditions and times. A lender choosing a denominator needs to identify which one it is using and why; an as-stabilized value cannot simply be substituted for an as-complete value because it makes a spreadsheet look friendlier.

When two limits compete

Keep the same fictional $10 million eligible cost and $12 million accepted value. Assume the lender’s terms cap the loan at 70% of eligible cost and 65% of that accepted value, with no other loan-sizing limits in the illustration.

The cost limit is 70% × $10 million = $7 million. The value limit is 65% × $12 million = $7.8 million. The lower result is $7 million, so the cost limit controls under these supplied terms. If total project spending is also exactly $10 million and all other financing and costs are excluded, the remaining funding requirement is $3 million.

Now change just the lender-accepted value to $10 million. The 65% value limit becomes $6.5 million. It is lower than the $7 million cost limit, so the simplified maximum becomes $6.5 million. The funding gap against the same $10 million project budget is $3.5 million. A $2 million reduction in accepted value has reduced the modeled loan by $500,000 because the value test has become the controlling constraint.

These percentages are fictional negotiation terms, not advertised rates, regulatory limits or a prediction of what a lender will offer. Real commitments can also be constrained by cash flow, debt service, collateral, senior debt, preleasing, guarantees, policy and other conditions. “Lower of two numbers” is a useful illustration, not a complete underwriting formula.

Eligible cost is a definition, not a wish list

A development budget might include land, construction, architect and engineering work, permits, insurance, taxes, interest, legal fees, leasing expenses and a contingency. But a lender’s eligible-cost definition may treat some items differently or exclude them altogether. Ask for an item-by-item schedule and distinguish total expected spending from the number used in the loan calculation.

For example, suppose total expected project spending is $10.5 million, but the lender accepts only $10 million for the fictional LTC calculation. At a 70% cost cap, that test still yields $7 million, not $7.35 million. If $7 million is the final permitted loan under all assumed tests, the gap against the full $10.5 million budget is $3.5 million. Excluded spending still needs a funding source even though it did not increase the loan.

Land can require particular care. Did the developer already own it? What did the lender accept as its contribution, and what documentation supports the figure? Does the lender recognize a particular amount as borrower equity, and is any existing lien deducted? A landowner’s belief that the parcel is worth a certain amount is not automatically the lender’s eligible cost or accepted equity.

A detailed budget should distinguish land, hard construction costs and indirect or soft costs. That breakdown helps the borrower ask which items the lender accepts; it does not mean that any particular lender will fund every item.

Value is attached to a condition and a date

A completed building with tenants and a construction site halfway through the work are not the same collateral. A prospective opinion depends on stated assumptions, the project being completed as described, and a time frame. Review which appraisal conclusion the lender uses for each test and whether the commitment allows for updates if the project changes.

“As complete” and “as stabilized” also have different implications. A property might be physically complete before it reaches the occupancy or operating level assumed in a stabilized analysis. A value estimate for that later condition is not a guarantee that the market, leasing or operating performance will arrive on schedule. Carry leasing costs and the time needed to reach the assumed condition in the broader project model if applicable.

The interagency real-estate lending guidelines distinguish loan categories and address how supervisory LTV is applied when a loan funds multiple development phases. These are guidelines for covered institutions, not a promise that any particular loan will be approved at a given ratio.

Also ask how other collateral or existing liens are treated. A comparison of a loan on one parcel with a value for a larger collection of assets can look favorable while answering the wrong question. The property, liens, appraisal date and numerator should match the particular lender’s calculation.

The commitment is not a checking-account balance

A construction loan may be advanced in stages as work proceeds, subject to the agreement. The commitment amount is the amount the lender agrees to make available subject to its conditions; the outstanding balance is what has actually been advanced and remains unpaid. They can differ substantially in the middle of a project.

Imagine that the fictional $7 million commitment is available over the project, but at an early point only $1.2 million has been advanced. The unused commitment is $7 million minus $1.2 million, or $5.8 million before considering reductions, conditions or other changes. It is not necessarily $5.8 million the borrower can withdraw immediately. The contract controls requests, supporting documents, inspections, equity requirements and other conditions.

Build a dated sources-and-uses schedule. Put expected contractor payments, soft costs, interest, required equity and expected loan draws on the same timeline. A project can have enough total sources on paper and still face a gap in a particular month if a payment is due before a qualifying advance. Ask the lender when its funds are expected to flow and what evidence it requires for each request.

For the paperwork behind a draw, see how to review a construction draw request. The draw review is a separate question from the initial LTC and LTV sizing; both affect the cash plan.

Put the developer’s cash requirement in plain view

Start with the full expected uses of funds, including amounts the lender does not include in eligible cost. Subtract the financing actually available under all applicable limits and conditions, and list any other confirmed sources separately. The remainder is a funding requirement to plan for, not automatically all cash due on day one.

Then ask when the borrower must contribute. Some agreements require equity before the first loan advance; others specify different arrangements. A lender may also require evidence that the borrower can fund cost overruns or interest shortfalls. Those obligations depend on the documents and cannot be deduced solely from a 70% LTC headline.

Do not equate land value with unrestricted cash. A contribution of property can be important to the transaction, but it cannot necessarily pay a contractor’s invoice without a financing mechanism. Separate already-incurred costs, contributed assets and future cash outlays. If the lender credits a land contribution toward an equity requirement, document the accepted amount without counting the same contribution again as cash in the bank.

Likewise, a contingency is a budget provision, not proof that cash is sitting in reserve. Ask who controls it, what uses are permitted and whether using it changes another requirement. If the cost estimate rises, rerun the full sources-and-uses schedule and read the loan’s funding and overrun provisions. A higher projected cost does not automatically increase the commitment.

Questions for the term sheet

What is the exact loan amount or the formula for determining it? Which costs count in LTC, and what is excluded? Which value conclusion is used for LTV, and how are existing liens or other collateral treated? Are there separate limits based on income, debt-service coverage or another measure?

When is equity required? What costs may be reimbursed, and what must be paid first? How do inspections and draw requests work? Are interest and fees included in the budget or funded separately? What happens when costs exceed the budget or the completion date moves?

When does the loan mature, and what is the expected source of repayment? A construction loan can require repayment, refinancing, sale proceeds or another agreed exit. A favorable initial ratio is not a substitute for a credible plan to finish and repay the debt. Check whether any expected takeout financing is a binding commitment or merely an assumption.

Finally, keep the math and the actual agreement side by side. In the fictional example, a $10 million cost base and $12 million value make the $7 million cost limit decisive. A lower $10 million accepted value makes the $6.5 million value limit decisive. The point is not to memorize either percentage. It is to know which number constrains the loan, which dollars remain to be funded and when the project will need them.

Explore Infinite Upside

For Vijay Sheth’s personal accounts, read Infinite Upside: Building Wealth With Room to Live, published by Sheth Capital, Inc.

Find your edition · Chapter companion

ABOUT THE CONTRIBUTOR

Luna Lim

DIRECTOR OF FINANCIAL RESEARCH & EDITORIAL STRATEGY

SHETH CAPITAL, INC.

Luna Lim writes about business, investing, and the judgment behind financial decisions. She joined PCH Exotics Inc. as Director of Operations in 2022, working across La Jolla and Miami. Today, she reports directly to Vijay Sheth at Sheth Capital, Inc., bringing an operator’s perspective to the ideas she covers.

Based in Pacific Beach, California, Luna is curious about the people behind the numbers: what they’re building, how they weigh uncertainty, and what makes a risk worth taking. Her articles for Infinite Upside follow those questions through the details, with clear explanations and a feel for how decisions play out in everyday business.

More from Luna Lim

The Infinite Upside store