A datacenter can add a newer rack of computers while the older racks keep working. Refreshing the network that connects them can be harder. If the network’s central equipment was built for an earlier link generation, adding faster equipment at the edge does not automatically remove that limit.
Google’s 2022 Jupiter account describes a way to make the physical connections themselves more adaptable. Optical circuit switches helped the network evolve from a Clos arrangement with spine blocks toward direct connections among aggregation blocks. The change supported incremental growth and mixed generations while the network continued carrying production traffic.
The interesting part is what the optics changed—and what work remained. Choosing where light travels is different from choosing how packets traverse the links already available. Jupiter combined both choices, with operating procedures for changing one without treating the other as an afterthought.
The old spine made a promise about future growth
In the Clos deployment described by the authors, aggregation blocks connected through a spine layer. The spine had to be provisioned for the network’s eventual scale. Later blocks could join, but their useful connectivity depended on that central layer and the technology with which it had been built.
This arrangement bought a useful kind of regularity. A common spine supplied paths among blocks without requiring each pair to have a dedicated direct connection. The cost was that a long-lived layer could constrain the bandwidth available to equipment added later.
The problem becomes clearer when hardware generations are mixed. A new block may support faster interfaces than an older spine can use. Its local capability does not change the interface at the other end of the link. Replacing the spine, meanwhile, is a large intervention in equipment that many existing blocks depend on.
The authors contrast that difficulty with the more local task of draining and replacing a rack of compute or storage capacity. They wanted the network to support a similarly incremental kind of evolution. That required changing the way connections among its large blocks were provided.
This is a particular deployment problem, not a finding that every Clos network is a poor design. A highly regular fabric has advantages. Jupiter’s alternative is interesting because it accepted different control and operating work to escape some of the constraints of that existing growth pattern.
An optical circuit is a physical connection
An optical circuit switch can establish a path between optical endpoints. In the technology discussed by the paper, mirrors steer light to make the selected connections. It does not have to interpret the contents of every packet passing through the light path.
That gives the circuit a different role from an electronic packet switch. Once an optical path is established, packet forwarding can use the resulting logical link. Changing the path alters which endpoints are connected. The optical circuit is therefore part of constructing the graph over which packet routing operates.
Jupiter used that capability to connect aggregation blocks through an optical interconnect layer rather than requiring all inter-block traffic to pass through an electronic spine. Standardized block interfaces helped it incorporate different link generations into the fabric.
The optical layer did not make endpoint capabilities irrelevant. The equipment and interfaces at each end still had to work together. Its benefit was removing the packet-processing generation of a fixed central spine from that particular place in the architecture, while giving the operator more freedom to choose connections.
The optical hardware had costs of its own. The authors describe using circulators to combine transmit and receive traffic onto a single fiber strand. That reduced the ports and fibers needed in the optical switching layer. It also required bidirectional circuits rather than independently chosen one-way connections.
New equipment still required physical installation. Fibers had to exist, components had to be added and faults still needed repair. Reconfiguration could change connections within the provisioned optical arrangement; it could not manufacture another rack or repair a damaged cable by changing software intent.
This is why the design is best understood as changing the physical work, not abolishing it. Some alterations that previously involved a patch-panel arrangement could be handled through optical switching. New capacity and repairs continued to have material tasks and limits.
Routing and topology worked on different questions
Routing asks which existing paths traffic should use. A network can respond to demand or a failed link by changing how traffic moves through the graph it currently has. That does not, by itself, create another physical connection between two blocks.
Topology engineering asks which connections should exist. Optical circuits gave Jupiter a way to alter those relationships. It could allocate inter-block connectivity according to its design and traffic information rather than treating all physical pairings as permanent.
The two controls had different timescales and responsibilities. Traffic engineering could react within the available topology. Topology changes were more deliberate interventions involving connection state and qualification. The mirrors were not selecting a new route independently for each passing packet.
Direct connection also did not mean that every packet necessarily took a direct path between its source and destination blocks. The paper describes using transit through another block when appropriate. That provided additional routing options, at the cost of using capacity on the intermediate block and links.
This creates a real tradeoff. Dedicated direct capacity can be attractive for a busy pair, while other demand still needs paths and room for variation. A topology too narrowly fitted to one traffic pattern could become awkward when the pattern changed or equipment became unavailable.
Heterogeneous blocks made the choice more specific. The paper describes routing traffic from a faster block toward a slower one through another faster block in some circumstances. That could preserve valuable fast ports on the source block, while consuming some aggregate bandwidth at the transit block.
Traffic and topology engineering therefore had to cooperate. The physical graph supplied possibilities; routing used them; demand and operating experience informed later graph choices. None of those statements implies that all traffic patterns can be carried without congestion on an arbitrary set of direct links.
Changing a link consumed capacity before it added value
A live circuit cannot be treated as empty merely because a new physical pairing would be desirable. The network has to move traffic away from capacity that will be removed or changed. Only then can the connection be altered and the resulting link qualified for service.
The Jupiter account describes automation around draining, reconfiguration, qualification and restoration. These are distinct operations. A command expressing a new intended pairing does not establish that the physical link has reached a usable state.
During a change, the network needs enough available paths and capacity to carry the traffic displaced from the affected links. The temporary state can therefore constrain the change sequence even if the final topology is attractive. An expansion is a succession of operating networks, not just a drawing of the destination.
Fault behavior had to be understood at those same boundaries. The authors describe keeping established optical cross-connects when control communication was lost: a fail-static arrangement. That avoided making a control-plane disconnection automatically erase the data paths, though performance could degrade while the system could not adapt.
Power loss was different. The paper explicitly states that the optical cross-connects were not maintained on loss of power. The physical links could break, and the network had to manage the resulting loss of capacity. A useful control-failure property should not be expanded into a promise that the optical path survives every failure.
Mixed generations became a normal design condition
The 2022 account reports a fabric that could evolve with aggregation blocks from different hardware generations. Interoperability across those generations was a design requirement, rather than a temporary embarrassment to be removed before the network could be considered finished.
That changed the expansion decision. A new block could be added and connected within the evolving fabric, rather than forcing an immediate replacement of all central equipment to obtain its value. Existing blocks could continue contributing while later pieces were introduced.
The advantage depends on the interfaces and connections actually available. Mixed generations can have different capabilities, and allocating links among them is not equivalent to assuming every old device has become as fast as the newest one. The design creates more choices about how to combine capacity; it does not erase the differences.
For an operator, that can be valuable because demand and hardware do not arrive on one perfectly synchronized replacement date. A fabric that tolerates heterogeneity can choose a sequence of upgrades. The relevant comparison includes the work and temporary capacity needed for that sequence, as well as the equipment in the final network.
The case has a traffic and cost boundary
The authors evaluated the design using their production experience and specified traffic analyses. That makes the paper unusually useful as an operating account, while keeping the evidence tied to the network and workloads they studied.
Its additional, explicitly unreviewed appendices examine models and simulations under stated assumptions. Some analytical results use idealized traffic and block conditions. Simulations also omit effects such as certain short bursts and transition details. Those results help reason about the design without establishing a universal capacity guarantee for every workload.
The architecture also removed equipment associated with the electronic spine, which changed network cost and power. The paper’s comparisons use that network boundary. They are not a direct observation of whole-datacenter energy, all company costs or a cash saving available to another operator with a different starting point.
The design traded part of the fixed spine’s structure for optical connectivity, traffic-aware decisions and carefully managed changes. It gave the operator a more granular way to choose what changed next, while keeping the rest of the network useful during that work.