Find the limit across the complete network

How do I find a network capacity bottleneck?

A blocked first routing attempt may leave usable capacity stranded. Show a feasible flow and a matching cut before calling it the limit.

A transfer network's capacity is not the sum of every route's capacity. Find a feasible flow from its source to its destination, conserving flow at each intermediate point. Then find a cut: a boundary separating source from destination. If the flow equals that boundary's outgoing capacity, you have both an achievable rate and a proof that the model allows no higher one.

There is another trap before that proof. An early routing choice can fill the wrong connections and make the network look exhausted. Revising part of the allocation may increase total throughput without adding capacity. A blocked first attempt is not necessarily the network's limit.

Define the network before adding the numbers

Consider a wholly fictional operation transferring identical units from source S through intermediate points A and B to destination T. Each arrow has a fixed maximum rate in units per hour. All five connections can operate simultaneously within their stated capacities.

The complete connections are S to A: six; S to B: four; A to B: five; A to T: four; B to T: six. There are no other physical connections. In particular, B has no physical route back to A.

Each intermediate point sends out exactly as much as it receives. There is no loss, creation or accumulation of units at A or B. Source supply and destination demand can support twelve units per hour; the network may not be able to carry that rate.

These are supplied steady-state capacity assumptions. They do not describe a timed batch beginning with empty routes, an actual conveyor trial or a customer delivery promise. The model excludes travel delays, setup, queues, shared operators, additional node limits and changing demand. If those constrain real work, they belong in the model.

Peter Shor's MIT network-flow notes define the capacity and conservation conditions and explain the maximum-flow/minimum-cut relationship. Our four-node example and rates are original teaching inputs.

See how an early route choice gets stuck

Start by allocating five units per hour along S–A–B–T. This fits every connection on that path, but fills A–B's entire five-unit capacity.

S–A has one unit of capacity left, so allocate another one along S–A–T. S–A is now full at six.

B–T has one unit of capacity left, so allocate another one along S–B–T. B–T is now full at six. Total source-to-destination flow is seven units per hour.

The resulting connection flows are S–A six, S–B one, A–B five, A–T one and B–T six. Check the intermediate accounts: A receives six and sends five plus one; B receives one plus five and sends six.

No further flow can be added along a wholly unused forward path without altering the allocation. S–A is full, while the remaining S–B route encounters a full B–T connection. Yet three units of S–B capacity and three units of A–T capacity remain unused.

Calling seven the maximum would mistake a routing decision for a physical limit. Before buying anything, examine whether part of the existing assignment can change.

Reroute without inventing a backward connection

Reduce the assigned A–B flow by three, from five to two. Replace those three units at B with three more directly from S: increase S–B from one to four.

A still receives six from S, but now sends only two to B. Send its other four directly to T by increasing A–T from one to four. B continues sending six to T, now supplied by four from S and two from A.

The new total is ten units per hour. All original connection capacities remain unchanged. The final flow uses no physical B-to-A connection.

In an algorithm's residual network, the reassignment can be represented by the path S–B–A–T. Its B–A step means canceling some previously assigned A–B flow, not sending actual units backward along a nonexistent route.

This distinction matters when taking an algorithm's intermediate output into an operating discussion. A residual arrow records an available revision to the allocation. It does not establish that a road, conveyor, permission or transfer procedure exists in that direction.

Every row shows one original directed connection. Rates share the same units-per-hour basis. The final assignment conserves flow at both intermediate points and stays within every supplied connection capacity.

Scroll horizontally if needed.

ConnectionCapacityEarly assignmentRevised assignment
S to A666
S to B414
A to B552
A to T414
B to T666

Prove ten is the limit with a cut

Put S, A and B on one side of a boundary and T on the other. Every completed source-to-destination transfer must cross that boundary through A–T or B–T.

The outgoing boundary capacity is four plus six = ten. No allocation can deliver more than ten under these capacities. We have already constructed one that delivers ten, so it is optimal for this model.

A separate boundary leaves only S on its source side. Its outgoing connections S–A and S–B also total ten. Thus this example has at least two minimum cuts. There is no single uniquely privileged “bottleneck machine” identified by the arithmetic.

All four possible source-side sets in this four-node network can be checked:

  • {S}: S–A six plus S–B four gives ten.
  • {S, A}: S–B four, A–B five and A–T four gives thirteen.
  • {S, B}: S–A six plus B–T six gives twelve.
  • {S, A, B}: A–T four plus B–T six gives ten.

Count only connections directed out of the source-side set. For {S, B}, A–B points into that set; it is not another outgoing escape route to add. The smallest cut capacity is ten, matching the feasible flow.

The critical-path guide examines timing and dependencies. A network cut here concerns a bound on conserved transfer rate. A critical path's duration and a minimum cut's capacity are different measures, even when both diagrams contain arrows.

Test an upgrade against all limiting boundaries

Suppose the only proposed change increases A–B capacity from five to eight. Neither ten-unit boundary changes. The existing ten-unit flow still fits, and no flow can cross the unchanged destination boundary above ten. Maximum throughput remains ten.

For another separate change, increase only S–A from six to eight. The source-side total becomes twelve, but the final A–T and B–T boundary still permits only ten. Again, maximum throughput remains ten.

Alternatively, increase only B–T from six to eight. The destination boundary now totals twelve, but the unchanged source connections still total ten. This upgrade alone also leaves the maximum at ten.

Now combine the two changes: S–A becomes eight and B–T becomes eight. Keep all other connections unchanged. An achievable flow is S–A eight, S–B four, A–B four, A–T four and B–T eight.

A receives eight and sends four plus four. B receives four plus four and sends eight. Source and destination totals are both twelve. The revised source and destination cuts each total twelve, proving this flow reaches the new bound.

The changes are complementary in this supplied network. Neither alone raises maximum flow, while both together do. That is not a purchase recommendation: no cost, installation plan, funding, permission or evidence that either change is actually available has been supplied.

Keep capacity distinct from cost and reliability

Adding all original capacities gives twenty-five units per hour. That sum is not throughput. The same unit can use several connections along its route, so adding their capacities can count stages of its journey more than once.

Nor is the capacity of one particular path its connection-capacity sum. Along S–A–T, the four-unit A–T limit constrains that path even though S–A can carry six. Alternative paths can then share connections, which is why their individual maximum rates cannot always be added independently either.

The system-reliability guide follows survival probabilities and shared failure points. A capacity of six units per hour is not a 60% probability, and a maximum-flow result says nothing about how often a connection is available.

The scarce-machine-hour guide selects a product mix using contribution and resource limits. This network treats all units as one homogeneous flow and maximizes their rate. It has no prices or different product priorities.

Restore a shared resource limit

For a separate model change, suppose S–A and S–B share one resource that can supply only eight units per hour across both connections together. Their individual six- and four-unit ratings remain, but they cannot both be fully used simultaneously.

The added condition is S–A flow plus S–B flow no greater than eight. An achievable assignment sends four through S–A–T and four through S–B–T, with zero on A–B. It delivers eight while respecting every original connection limit.

The shared source condition also bounds every possible delivery at eight. Matching that bound proves eight is the maximum in this changed model. The original ten-unit calculation was correct for independent simultaneous capacities; it is inapplicable once that omitted resource limit matters.

Leave a capacity record that can be challenged

Retain the actual directed connections, common measurement units, capacity evidence and assumptions about simultaneous use. A connection rated in units per shift cannot be combined unchanged with one rated in units per hour.

Check each intermediate point's incoming and outgoing flow, every connection's nonnegative assignment and its remaining capacity. Keep both the feasible flow and the matching cut; one shows how the rate is achieved, the other why the model permits no more.

Finally, restore any omitted constraint before making an operating commitment. A shared operator, finite buffer, variable travel time or startup delay may require a different model. The ten-unit result is a steady-state capacity conclusion under stated assumptions, not a promise to finish ten units during the first hour of a real shift.

Explore Infinite Upside

For Vijay Sheth’s personal accounts, read Infinite Upside: Building Wealth With Room to Live, published by Sheth Capital, Inc.

Find your edition · Chapter companion

Choose an edition

Choose an edition

ABOUT THE CONTRIBUTOR

Luna Lim

DIRECTOR OF FINANCIAL RESEARCH & EDITORIAL STRATEGY

SHETH CAPITAL, INC.

Luna Lim writes about business, investing, and the judgment behind financial decisions. She joined PCH Exotics Inc. as Director of Operations in 2022, working across La Jolla and Miami. Today, she reports directly to Vijay Sheth at Sheth Capital, Inc., bringing an operator’s perspective to the ideas she covers.

Based in Pacific Beach, California, Luna is curious about the people behind the numbers: what they’re building, how they weigh uncertainty, and what makes a risk worth taking. Her articles for Infinite Upside follow those questions through the details, with clear explanations and a feel for how decisions play out in everyday business.

More from Luna Lim

The Infinite Upside store